Skip to content

Merge branch 'fibers' into jmh_fibers #295

Merge branch 'fibers' into jmh_fibers

Merge branch 'fibers' into jmh_fibers #295

Triggered via push August 19, 2024 16:59
Status Failure
Total duration 6h 0m 23s
Artifacts

ci.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 2 warnings
build (ubuntu-latest, jdk21)
The job running on runner GitHub Actions 58 has exceeded the maximum execution time of 360 minutes.
build (ubuntu-latest, jdk21)
The operation was canceled.
build (windows-latest, jdk21)
The following actions uses node12 which is deprecated and will be forced to run on node16: actions/checkout@v2. For more info: https://github.blog/changelog/2023-06-13-github-actions-all-actions-will-run-on-node16-instead-of-node12-by-default/
build (windows-latest, jdk21)
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/checkout@v2. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/