fix: jaas integration test #1331
Triggered via pull request
December 17, 2024 14:00
Status
Failure
Total duration
1h 15m 32s
Artifacts
–
test_integration.yml
on: pull_request
Build
1m 41s
Matrix: Add Machine
Matrix: Integration
Annotations
4 errors and 1 warning
Integration (1.9.*, 5.21/stable, lxd, 5.21, 3)
Process completed with exit code 1.
|
Integration (1.9.*, 5.21/stable, lxd, 5.21, 2.9)
Process completed with exit code 1.
|
Integration (1.9.*, 5.21/stable, microk8s, 1.28-strict, 3.1)
The job running on runner juju-openstack-amd64-jammy-large-ps6-0-ad5af1071522 has exceeded the maximum execution time of 60 minutes.
|
Integration (1.9.*, 5.21/stable, microk8s, 1.28-strict, 3.1)
The operation was canceled.
|
Build
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|