GLSP-1380: Remove dependency to Guava #244
Merged
Jenkins - GLSP / CI Jenkins Build
succeeded
Aug 30, 2024 in 3m 40s
Success
Details
- Declarative: Checkout SCM (8 sec)
- Declarative: Tool Install (0.94 sec)
- Build: Eclipse-based (P2) (1 min 24 sec)
- Build: Plain Maven (M2) (42 sec)
- Build: fatjar (31 sec)
- Checkstyle (16 sec)
- Tests (24 sec)
- Deploy (master only) (3.8 sec)
- Deploy P2 (0.7 sec)
- Deploy M2 (1.2 sec)
- Trigger Java21 build (0.94 sec)
- Declarative: Post Actions (6.9 sec)
- Declarative: Tool Install (0.94 sec)
Loading