Skip to content
Triggered via push November 22, 2023 09:24
Status Failure
Total duration 7m 47s
Artifacts

ci.yml

on: push
Matrix: Build and Test
Matrix: Jmh Publish
Matrix: Unsafe Scoverage
Matrix: Release Drafter
Matrix: Publish Artifacts
Fit to window
Zoom out
Zoom in

Annotations

12 errors
Unsafe Scoverage (ubuntu-latest, 2.13.12, temurin@8)
Process completed with exit code 1.
Build and Test (ubuntu-latest, 3.3.1, graal_graalvm@17)
Process completed with exit code 1.
Build and Test (ubuntu-latest, 3.3.1, temurin@8)
The job was canceled because "ubuntu-latest_3_3_1_graal" failed.
Build and Test (ubuntu-latest, 3.3.1, temurin@8)
The operation was canceled.
Build and Test (ubuntu-latest, 2.12.18, graal_graalvm@17)
The job was canceled because "ubuntu-latest_3_3_1_graal" failed.
Build and Test (ubuntu-latest, 2.12.18, graal_graalvm@17)
The operation was canceled.
Build and Test (ubuntu-latest, 2.12.18, temurin@8)
The job was canceled because "ubuntu-latest_3_3_1_graal" failed.
Build and Test (ubuntu-latest, 2.12.18, temurin@8)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13.12, temurin@8)
The job was canceled because "ubuntu-latest_3_3_1_graal" failed.
Build and Test (ubuntu-latest, 2.13.12, temurin@8)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13.12, graal_graalvm@17)
The job was canceled because "ubuntu-latest_3_3_1_graal" failed.
Build and Test (ubuntu-latest, 2.13.12, graal_graalvm@17)
The operation was canceled.