Skip to content

Add logger for DALLE #15

Add logger for DALLE

Add logger for DALLE #15

Triggered via push October 14, 2023 15:16
Status Failure
Total duration 1m 13s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

linters.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

10 errors
build (3.9)
Process completed with exit code 1.
build (3.9)
Process completed with exit code 1.
build (3.9)
Process completed with exit code 1.
build (3.9)
Process completed with exit code 22.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
Process completed with exit code 22.
build (3.10)
The operation was canceled.
build (3.11.5)
The job was canceled because "_3_9" failed.
build (3.11.5)
Process completed with exit code 22.
build (3.11.5)
The operation was canceled.