Skip to content

Increase delay time #57

Increase delay time

Increase delay time #57

Triggered via push September 19, 2024 09:56
Status Failure
Total duration 52s
Billable time 13m
Artifacts

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
test (3.2, rails_6_1)
Process completed with exit code 1.
test (3.1, rails_6_1)
Process completed with exit code 1.
test (3.3, rails_7_1)
The job was canceled because "_3_2_rails_6_1" failed.
test (3.3, rails_7_0)
The job was canceled because "_3_2_rails_6_1" failed.
test (3.3, rails_7_0)
The operation was canceled.
test (3.1, rails_7_2)
The job was canceled because "_3_2_rails_6_1" failed.
test (3.1, rails_7_2)
The operation was canceled.
test (3.2, rails_7_1)
The job was canceled because "_3_2_rails_6_1" failed.
test (3.2, rails_7_1)
The operation was canceled.
test (3.1, rails_7_0)
The job was canceled because "_3_2_rails_6_1" failed.
test (3.1, rails_7_0)
The operation was canceled.