Skip to content

image name fix

image name fix #9

Triggered via push November 8, 2023 00:57
Status Failure
Total duration 26s
Artifacts

unit-tests.yaml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 6 warnings
build (-Pscala-2.12 -Pspark3)
Docker pull failed with exit code 1
build (-Pscala-2.11 -Pspark2)
The job was canceled because "_-Pscala-2_12_-Pspark3" failed.
build (-Pscala-2.11 -Pspark2)
Docker pull failed with exit code 1
build (-Pscala-2.12 -Pspark2)
The job was canceled because "_-Pscala-2_12_-Pspark3" failed.
build (-Pscala-2.12 -Pspark2)
The operation was canceled.
build (-Pscala-2.12 -Pspark3)
Docker pull failed with exit code 1, back off 3.987 seconds before retry.
build (-Pscala-2.12 -Pspark3)
Docker pull failed with exit code 1, back off 2.38 seconds before retry.
build (-Pscala-2.11 -Pspark2)
Docker pull failed with exit code 1, back off 3.789 seconds before retry.
build (-Pscala-2.11 -Pspark2)
Docker pull failed with exit code 1, back off 4.285 seconds before retry.
build (-Pscala-2.12 -Pspark2)
Docker pull failed with exit code 1, back off 5.525 seconds before retry.
build (-Pscala-2.12 -Pspark2)
Docker pull failed with exit code 1, back off 5.853 seconds before retry.