[ETHEREUM-CONTRACT] add deployment view of Superfluid framework (#1776) #707
ci.canary.yml
on: push
Build and Test Subgraph (Development Branch)
/
Run subgraph unit tests
6m 8s
Build and Test Subgraph (Development Branch)
/
Run subgraph integration tests
11m 30s
Build and Test SDK-Core Coverage (Canary Branch)
/
Test SDK-Core
12m 56s
Matrix: Build and test essential packages of dev branch
Matrix: Build and Test Spec Haskell (Canary Branch) / test-spec-haskell
Hot Fuzz (Development Branch)
/
Test HotFuzz - Linux
3m 12s
Build and Test Solidity Semantic Money (Canary Branch)
/
Test solidity-semantic-money - Linux
7m 23s
Coverage test ethereum-contracts (Canary Branch)
/
Preparing Conditional Strategy Matrix
5s
Checking what packages need to be built
3s
Build and Test SDK-Core (Development Branch)
/
Test SDK-Core
12m 21s
Matrix: Build and Test Automation Contracts (Canary Branch) / Test Automation Contracts
Matrix: Coverage test ethereum-contracts (Canary Branch) / Test ethereum-contracts
Deploy Hosted Service Subgraph to dev endpoints on all networks
/
Build and Deploy Subgraph
Deploy Hosted Service Subgraph to dev endpoints on all networks
/
Show Contexts
Upload Coverage Reports (Feature Branch)
/
Upload coverage reports
2m 26s
Publish canary packages to registries
8m 1s
Publish canary HTML docs
12m 15s
Matrix: Upgrade ethereum-contracts on canary testnet (protocol release version "canary")
Annotations
2 errors
Upgrade ethereum-contracts on canary testnet (protocol release version "canary") (avalanche-fuji)
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 360 minutes.
|
Upgrade ethereum-contracts on canary testnet (protocol release version "canary") (avalanche-fuji)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
ethereum-contracts-coverage
Expired
|
4.96 MB |
|
sdk-core-coverage
Expired
|
35.4 MB |
|