Skip to content

Integration Tests #68921

Integration Tests

Integration Tests #68921

Triggered via pull request November 11, 2024 19:14
Status Failure
Total duration 6m 3s
Billable time 20m
Artifacts

integration-tests.yml

on: pull_request
Get Solana Sha From Go Mod
36s
Get Solana Sha From Go Mod
Matrix: lint-integration-tests
Check If Solana Test Image Exists
7s
Check If Solana Test Image Exists
Get ProjectSerum Version
4s
Get ProjectSerum Version
Solana Build Artifacts
4s
Solana Build Artifacts
Solana Build Test Image
5s
Solana Build Test Image
Run CCIP E2E Tests For Merge Queue  /  Get remote runner test image
Run CCIP E2E Tests For Merge Queue / Get remote runner test image
Run CCIP E2E Tests For PR  /  Get remote runner test image
Run CCIP E2E Tests For PR / Get remote runner test image
Run Core E2E Tests For Merge Queue  /  Get remote runner test image
Run Core E2E Tests For Merge Queue / Get remote runner test image
Run Core E2E Tests For PR  /  Get remote runner test image
Run Core E2E Tests For PR / Get remote runner test image
ETH Smoke Tests
3s
ETH Smoke Tests
Clean up integration environment deployments
26s
Clean up integration environment deployments
Show Chainlink Node Go Coverage
12s
Show Chainlink Node Go Coverage
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Build Chainlink Image (plugins)
assignment mismatch: 1 variable but triggers.NewMercuryTriggerService returns 2 values
Build Chainlink Image (plugins)
not enough arguments in call to triggers.NewMercuryTriggerService
Build Chainlink Image (plugins)
assignment mismatch: 1 variable but triggers.NewMercuryTriggerService returns 2 values
Build Chainlink Image (plugins)
not enough arguments in call to triggers.NewMercuryTriggerService
Build Chainlink Image (plugins)
buildx failed with: ERROR: failed to solve: process "/bin/sh -c bash -c \"make install-chainlink TAGS=\\\"$TAGS\\\"\"" did not complete successfully: exit code: 2
Build Chainlink Image
The job was canceled because "_plugins__plugins_chainli" failed.
Lint integration-tests
golangci-lint exit with code 3
Lint load
The job was canceled because "integration-tests_e2e-tes" failed.
Lint load
golangci-lint exit with code 3
ETH Smoke Tests
Process completed with exit code 1.