Skip to content

Update sbt-projectmatrix to 0.9.2 (#1626) #1996

Update sbt-projectmatrix to 0.9.2 (#1626)

Update sbt-projectmatrix to 0.9.2 (#1626) #1996

Triggered via push January 13, 2024 09:30
Status Failure
Total duration 6h 3m 7s
Artifacts

test.yml

on: push
Matrix: build
ci-passed
0s
ci-passed
Fit to window
Zoom out
Zoom in

Annotations

3 errors
build (2_13, test)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 360 minutes.
build (2_13, test)
Java heap space
build (2_13, test)
The operation was canceled.