Skip to content

Fix compat target #2267

Fix compat target

Fix compat target #2267

Triggered via push September 30, 2024 02:16
Status Failure
Total duration 3m 44s
Artifacts

test.yml

on: push
Matrix: build
ci-passed
0s
ci-passed
Fit to window
Zoom out
Zoom in

Annotations

15 errors
build (2_12, e2e)
Process completed with exit code 1.
build (3, e2e)
The job was canceled because "_2_12_e2e" failed.
build (3, e2e)
The operation was canceled.
build (2_12, test)
The job was canceled because "_2_12_e2e" failed.
build (2_12, test)
The operation was canceled.
build (3, scala3_compat_test)
The job was canceled because "_2_12_e2e" failed.
build (3, scala3_compat_test)
The operation was canceled.
build (2_13, test)
The job was canceled because "_2_12_e2e" failed.
build (2_13, test)
The operation was canceled.
build (2_13, e2e)
The job was canceled because "_2_12_e2e" failed.
build (2_13, e2e)
The operation was canceled.
build (2_13, scala3_compat_test)
The job was canceled because "_2_12_e2e" failed.
build (2_13, scala3_compat_test)
The operation was canceled.
build (3, test)
The job was canceled because "_2_12_e2e" failed.
build (3, test)
The operation was canceled.