Skip to content

Merge pull request #3038 from responsible-ai-collaborative/staging #522

Merge pull request #3038 from responsible-ai-collaborative/staging

Merge pull request #3038 from responsible-ai-collaborative/staging #522

Triggered via push August 26, 2024 19:05
Status Cancelled
Total duration 47s
Artifacts

production.yml

on: push
cache-modifier  /  prepare-cache
0s
cache-modifier / prepare-cache
Matrix: call-test-playwright-full / Run Playwright tests
call-test-api  /  Run tests
23s
call-test-api / Run tests
call-atlas  /  push
18s
call-atlas / push
call-test-playwright-full  /  merge-reports
0s
call-test-playwright-full / merge-reports
call-test-build  /  Build site for testing
call-test-build / Build site for testing
Matrix: call-test / Run Cypress tests
Waiting for pending jobs
Matrix: call-test-playwright / Run Playwright tests
Waiting for pending jobs
call-test-playwright  /  merge-reports
call-test-playwright / merge-reports
call-deploy  /  netlify-deploy
call-deploy / netlify-deploy
Fit to window
Zoom out
Zoom in

Annotations

12 errors
call-atlas / push
The run was canceled by @cesarvarela.
call-atlas / push
The operation was canceled.
call-test-playwright-full / Run Playwright tests (1, 4)
The run was canceled by @cesarvarela.
call-test-playwright-full / Run Playwright tests (1, 4)
The operation was canceled.
call-test-playwright-full / Run Playwright tests (4, 4)
The run was canceled by @cesarvarela.
call-test-playwright-full / Run Playwright tests (4, 4)
The operation was canceled.
call-test-playwright-full / Run Playwright tests (3, 4)
The run was canceled by @cesarvarela.
call-test-playwright-full / Run Playwright tests (3, 4)
The operation was canceled.
call-test-playwright-full / Run Playwright tests (2, 4)
The run was canceled by @cesarvarela.
call-test-playwright-full / Run Playwright tests (2, 4)
The operation was canceled.
call-test-api / Run tests
The run was canceled by @cesarvarela.
call-test-api / Run tests
The operation was canceled.