Skip to content

quark-engine/gsoc2021-ShengFengLu

Folders and files

NameName
Last commit message
Last commit date

Latest commit

 

History

4 Commits
 
 
 
 

Repository files navigation

gsoc2021-ShengFengLu

Project Mentor: JunWei Song, KunYu Chen

Timeline

June 12 - June 28

  • Enrich all tests for Quark-Engine.
  • Adjust the behavior classification module.

June 28 - July 13

  • Add those features mentioned above to the five-stage analysis process.
  • Introduce the capability of multi-dex analysis.
  • Support a comprehensive call graph.

July 13 - July 27

  • Propose a strategy for bottleneck detection, mitigation, and evaluate the effectiveness.
  • Verify the optimization result.

July 27 - August 10

  • Continuously verify the analysis result.
  • Introduce the concept of parallel computing.

August 10 - August 24

  • To be in constant touch with the developer in Quark-Engine and adjust the code.
  • Bug fixes, error handling, and code readability improvement.
  • Fulfill the document and tests for all the above components.

About

No description, website, or topics provided.

Resources

Stars

Watchers

Forks

Releases

No releases published

Packages

No packages published