ci: fix sync job after oras/ubuntu upgrade #2575
build.yaml
on: pull_request
Matrix: Build ZOT multiarch
Release Artifact Checksums
0s
Annotations
11 errors and 1 warning
Build ZOT multiarch (darwin, arm64)
Process completed with exit code 2.
|
Build ZOT multiarch (freebsd, amd64)
The job was canceled because "darwin_arm64" failed.
|
Build ZOT multiarch (freebsd, amd64)
The operation was canceled.
|
Build ZOT multiarch (freebsd, arm64)
The job was canceled because "darwin_arm64" failed.
|
Build ZOT multiarch (freebsd, arm64)
The operation was canceled.
|
Build ZOT multiarch (linux, arm64)
The job was canceled because "darwin_arm64" failed.
|
Build ZOT multiarch (linux, arm64)
The operation was canceled.
|
Build ZOT multiarch (linux, amd64)
The job was canceled because "darwin_arm64" failed.
|
Build ZOT multiarch (linux, amd64)
The operation was canceled.
|
Build ZOT multiarch (darwin, amd64)
The job was canceled because "darwin_arm64" failed.
|
Build ZOT multiarch (darwin, amd64)
The operation was canceled.
|
Build ZOT multiarch (darwin, arm64)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|