ensure integration tests build #1437
pr-chromatic-tests.yml
on: push
Playwright Tests
11m 17s
Chromatic Tests
0s
Annotations
2 errors and 1 warning
Playwright Tests
buildx failed with: ERROR: failed to solve: process "/bin/sh -c pip install --no-cache-dir --upgrade --retries 5 --timeout 30 -r /tmp/requirements.txt" did not complete successfully: exit code: 1
|
Playwright Tests
buildx failed with: ERROR: failed to solve: process "/bin/sh -c pip install --no-cache-dir --upgrade --retries 5 --timeout 30 -r /tmp/requirements.txt" did not complete successfully: exit code: 1
|
Playwright Tests
No files were found with the provided path: ./web/test-results. No artifacts will be uploaded.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
docker-logs
|
152 Bytes |
|
onyx-dot-app~onyx~3G4XN9.dockerbuild
|
31.7 KB |
|
onyx-dot-app~onyx~EV4Z2F.dockerbuild
|
36.1 KB |
|
onyx-dot-app~onyx~G4SJ8X.dockerbuild
|
34.1 KB |
|
onyx-dot-app~onyx~PWI2G9.dockerbuild
|
31.3 KB |
|