Skip to content

Working version, ready to refactor. #9

Working version, ready to refactor.

Working version, ready to refactor. #9

Triggered via push March 11, 2024 06:58
Status Failure
Total duration 42s
Artifacts

tests.yml

on: push
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

9 errors
tests (ubuntu-latest, 3.11, py311)
Process completed with exit code 1.
tests (ubuntu-latest, 3.12, py312)
The job was canceled because "ubuntu-latest_3_11_py311" failed.
tests (ubuntu-latest, 3.12, py312)
The operation was canceled.
tests (ubuntu-latest, 3.8, py38)
The job was canceled because "ubuntu-latest_3_11_py311" failed.
tests (ubuntu-latest, 3.8, py38)
The operation was canceled.
tests (ubuntu-latest, 3.10, py310)
The job was canceled because "ubuntu-latest_3_11_py311" failed.
tests (ubuntu-latest, 3.10, py310)
The operation was canceled.
tests (ubuntu-latest, 3.9, py39)
The job was canceled because "ubuntu-latest_3_11_py311" failed.
tests (ubuntu-latest, 3.9, py39)
The operation was canceled.