Expand Up @@ -119,7 +119,7 @@ <h2>Select year (<span class="year"></span>):</h2>
<p>Select <strong>Yes</strong> and the colour scale will change depending on the year you have selected. This will help improve contrast for each area within your chosen year. Select <strong>No</strong> and the colour scale will stay the same as you move through the years.</p>
</div>
</div>
<div id="issues"><a href="#" onClick="saveDOMImage(document.getElementById('screenshot'));">Save map as PNG</a> | <a href="graphs.html">Graphs to accompany this tool</a> | <a href="https://github.com/odileeds/northern-powergrid/tree/master/2024-DFES/data/scenarios/primaries">Get the data</a> | <a href="https://github.com/odileeds/northern-powergrid/issues/">Report any issues you find</a> with our tool</div>
<div id="issues"><a href="#" onClick="saveDOMImage(document.getElementById('screenshot'));">Save map as PNG</a> | <a href="graphs.html">Graphs to accompany this tool</a> | <a href="https://northernpowergrid.opendatasoft.com/explore/dataset/northern-powergrid-dfes/">Get the data</a> | <a href="https://github.com/odileeds/northern-powergrid/issues/">Report any issues you find</a> with our tool</div>
</div>
</div>
</div>
Expand Down Expand Up @@ -220,7 +220,7 @@ <h3>Geographies</h3>
<h3>Local Authority view</h3>
<p>The model predictions have been created by Primary substation and that is the definitive view. The Local Authority view is constructed from the Primary substation values. We have found the proportion of a Primary substation's customers in each Local Authority district (as defined in April 2019) by adding up the customers in each Output Area belonging to a specific Local Authority district. For some parameters (e.g. electric vehicles) the values from the Primary substations are apportioned to each Local Authority District and then summated into totals. For values which can't be summated (e.g. Peak demand) we have shown the maximum value for any Primary substation that serves a Local Authority.</p>
<p>For Local Authorities which are only partially in Northern Powergrid areas the model only produces forecasts for the area served by Northern Powergrid, so it is not a total Local Authority forecast. Examples of these Local Authorities partially served by Northern Powergrid include Bassetlaw, East Lindsey, High Peak, North East Derbyshire, North East Lincolnshire, North Lincolnshire, Pendle, West Lindsey.</p>
<p>There are some additional major sites situated within a Local Authority area which distribute into many Local Authority areas and which may have further direct connections for large wind, solar and other generation. Direct connects to Grid Supply Points (connection points between the GB transmission network and Northern Powergrid’s distribution network), comprised of wind generation and co-located storage, have been allocated to local authorities on the basis of the greenspace available to build wind farms, while direct connections to Bulk Supply Points (connection points on NPg's network which are fed from the Grid Supply Points and supply the primary substations) have been included on the basis of the location of Primary substations fed by each bulk supply point. The underlying data can be downloaded from Data Mill North. </p>
<p>There are some additional major sites situated within a Local Authority area which distribute into many Local Authority areas and which may have further direct connections for large wind, solar and other generation. Direct connects to Grid Supply Points (connection points between the GB transmission network and Northern Powergrid’s distribution network), comprised of wind generation and co-located storage, have been allocated to local authorities on the basis of the greenspace available to build wind farms, while direct connections to Bulk Supply Points (connection points on NPg's network which are fed from the Grid Supply Points and supply the primary substations) have been included on the basis of the location of Primary substations fed by each bulk supply point. The underlying data can be downloaded from <a href="https://northernpowergrid.opendatasoft.com/">our Open Data Portal</a>.</p>

<h3>Data</h3>
<p><a href="https://datamillnorth.org/dataset/2j7lm/northern-powergrid-dfes-2023">DFES 2023 data files will be found on the Northern Powergrid Data Portal</a> and the <a href="https://github.com/odileeds/northern-powergrid/tree/master/2023-DFES/data/scenarios/primaries">Primary substation data files</a> that power this visualisation are stored with this <a href="https://github.com/odileeds/northern-powergrid">repository on Github</a>.</p>