Skip to content

fix monitoring

fix monitoring #65

Triggered via push February 15, 2024 11:02
Status Failure
Total duration 1m 33s
Artifacts

ci.yml

on: push
build-push-broker
26s
build-push-broker
build-push-coordinator
48s
build-push-coordinator
Static Code Analysis
9s
Static Code Analysis
Deploy Monitoring to Production
22s
Deploy Monitoring to Production
Matrix: lint-test
Deploy Broker to Production
19s
Deploy Broker to Production
Deploy Coordinator to Production
18s
Deploy Coordinator to Production
Fit to window
Zoom out
Zoom in

Annotations

5 errors
lint-test (3.9)
Process completed with exit code 1.
lint-test (3.10)
The job was canceled because "_3_9" failed.
lint-test (3.10)
Process completed with exit code 1.
lint-test (3.8)
The job was canceled because "_3_9" failed.
lint-test (3.8)
The operation was canceled.