fix monitoring #65
ci.yml
on: push
build-push-broker
26s
build-push-coordinator
48s
Static Code Analysis
9s
Deploy Monitoring to Production
22s
Matrix: lint-test
Deploy Broker to Production
19s
Deploy Coordinator to Production
18s
Annotations
5 errors
lint-test (3.9)
Process completed with exit code 1.
|
lint-test (3.10)
The job was canceled because "_3_9" failed.
|
lint-test (3.10)
Process completed with exit code 1.
|
lint-test (3.8)
The job was canceled because "_3_9" failed.
|
lint-test (3.8)
The operation was canceled.
|