fix. #64
ci.yml
on: push
build-push-broker
23s
build-push-coordinator
45s
Static Code Analysis
9s
Matrix: lint-test
Deploy Broker to Production
34s
Deploy Coordinator to Production
36s
Annotations
5 errors
lint-test (3.10)
Process completed with exit code 1.
|
lint-test (3.8)
The job was canceled because "_3_10" failed.
|
lint-test (3.8)
Process completed with exit code 1.
|
lint-test (3.9)
The job was canceled because "_3_10" failed.
|
lint-test (3.9)
The operation was canceled.
|