fix. #63
ci.yml
on: push
build-push-broker
21s
build-push-coordinator
39s
Static Code Analysis
10s
Matrix: lint-test
Deploy Broker to Production
27s
Deploy Coordinator to Production
17s
Annotations
5 errors
lint-test (3.10)
Process completed with exit code 1.
|
lint-test (3.8)
The job was canceled because "_3_10" failed.
|
lint-test (3.8)
Process completed with exit code 1.
|
lint-test (3.9)
The job was canceled because "_3_10" failed.
|
lint-test (3.9)
The operation was canceled.
|