fix lint #55
ci.yml
on: push
build-push-broker
27s
build-push-coordinator
44s
Static Code Analysis
8s
Matrix: lint-test
Deploy Broker to Production
0s
Deploy Coordinator to Production
0s
Annotations
7 errors
lint-test (3.10)
Process completed with exit code 1.
|
lint-test (3.9)
The job was canceled because "_3_10" failed.
|
lint-test (3.9)
Process completed with exit code 1.
|
lint-test (3.8)
The job was canceled because "_3_10" failed.
|
lint-test (3.8)
Process completed with exit code 1.
|
Deploy Broker to Production
The run was canceled by @mahdigheidi.
|
Deploy Coordinator to Production
The run was canceled by @mahdigheidi.
|