update checkout action #53
ci.yml
on: push
build-push-broker
29s
build-push-coordinator
45s
Static Code Analysis
8s
Matrix: lint-test
Deploy Broker to Production
18s
Deploy Coordinator to Production
26s
Annotations
6 errors
Static Code Analysis
Process completed with exit code 1.
|
lint-test (3.10)
Process completed with exit code 1.
|
lint-test (3.8)
The job was canceled because "_3_10" failed.
|
lint-test (3.8)
Process completed with exit code 1.
|
lint-test (3.9)
The job was canceled because "_3_10" failed.
|
lint-test (3.9)
Process completed with exit code 1.
|