\section{Throughput for Focused Light}
\label{sec:throughout_for_focused_light}

The ComCam throughput has been estimated in ugriz using FGCM and is discussed in detail in Sec.~\ref{sec:photometric_calbration}.
The ComCam throughput has been estimated in ugriz using FGCM and is discussed in detail in Sec.~\ref{sec:photometric_calibration}.

\subsection{Collimated Beam Projector Status}

The Collimated Beam Projector (CBP) and Ekspla tunable laser were both installed on the dome during the week of November 18. See Figs.~\ref{fig:cbp_1, fig:cbp_2, fig:laser} figThey will both be connected to ethernet and a laser interlock system will be installed. First photon from the CBP is projected for December 2.
The Collimated Beam Projector (CBP) and Ekspla tunable laser were both installed on the dome during the week
of November 18. See Figs.~\ref{fig:cbp_1}, \ref{fig:cbp_2}, \ref{fig:laser} They will both be connected to ethernet and a laser interlock system will be installed. First photon from the CBP is projected for December 2.

\begin{figure}[htbp]
\includegraphics[width=\textwidth]{throughput_for_focused_light_figures/cbp_on_dome_1.png}