Allow switch kwarg in refresh to switch to local charms #559
Triggered via pull request
October 23, 2023 18:01
Status
Failure
Total duration
1h 12m 33s
Artifacts
–
test.yaml
on: pull_request
Matrix: Linter
Matrix: Unit tests
Matrix: Integration
Annotations
5 errors
Integration (3.9)
Process completed with exit code 1.
|
Integration (3.8)
The job was canceled because "_3_9" failed.
|
Integration (3.8)
The operation was canceled.
|
Integration (3.10)
The job was canceled because "_3_9" failed.
|
Integration (3.10)
The operation was canceled.
|