Skip to content

Application refresh with resources #540

Application refresh with resources

Application refresh with resources #540

Triggered via pull request October 13, 2023 19:22
Status Failure
Total duration 1h 12m 36s
Artifacts

test.yaml

on: pull_request
Matrix: Linter
Matrix: Unit tests
Matrix: Integration
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Integration (3.8)
Process completed with exit code 1.
Integration (3.9)
The job was canceled because "_3_8" failed.
Integration (3.9)
The operation was canceled.
Integration (3.10)
The job was canceled because "_3_8" failed.
Integration (3.10)
The operation was canceled.