Application refresh with resources #540
Triggered via pull request
October 13, 2023 19:22
Status
Failure
Total duration
1h 12m 36s
Artifacts
–
test.yaml
on: pull_request
Matrix: Linter
Matrix: Unit tests
Matrix: Integration
Annotations
5 errors
Integration (3.8)
Process completed with exit code 1.
|
Integration (3.9)
The job was canceled because "_3_8" failed.
|
Integration (3.9)
The operation was canceled.
|
Integration (3.10)
The job was canceled because "_3_8" failed.
|
Integration (3.10)
The operation was canceled.
|