Skip to content

Bump actions/setup-node from 3 to 4 #151

Bump actions/setup-node from 3 to 4

Bump actions/setup-node from 3 to 4 #151

Triggered via push October 24, 2023 09:58
Status Failure
Total duration 52s
Artifacts 1

cd.yml

on: push
Matrix: publish_on_push
Fit to window
Zoom out
Zoom in

Annotations

9 errors
CD for inrupt-rdf/Test/vocab-inrupt-test.yml
Process completed with exit code 1.
CD for inrupt-rdf/Core/vocab-inrupt-core.yml
The job was canceled because "inrupt-rdf_Test_vocab-inr" failed.
CD for inrupt-rdf/Core/vocab-inrupt-core.yml
The operation was canceled.
CD for solid-rdf/vocab-solid.yml
The job was canceled because "inrupt-rdf_Test_vocab-inr" failed.
CD for solid-rdf/vocab-solid.yml
The operation was canceled.
CD for inrupt-rdf/Glossary/vocab-inrupt-glossary.yml
The job was canceled because "inrupt-rdf_Test_vocab-inr" failed.
CD for inrupt-rdf/Glossary/vocab-inrupt-glossary.yml
The operation was canceled.
CD for common-rdf/vocab-common-rdf.yml
The job was canceled because "inrupt-rdf_Test_vocab-inr" failed.
CD for common-rdf/vocab-common-rdf.yml
The operation was canceled.

Artifacts

Produced during runtime
Name Size
mvn-deploy Expired
8.98 KB