chore: move tests to separate repo #11325
Triggered via pull request
October 29, 2024 16:54
Status
Cancelled
Total duration
1m 38s
Artifacts
–
iroha2-dev-pr.yml
on: pull_request
build_wasm
1m 21s
consistency
0s
fmt_and_clippy
12s
pr-generator-build
0s
Annotations
8 errors
consistency
Canceling since a higher priority waiting request for 'I2::Dev::Tests-refs/pull/5203/merge' exists
|
build_wasm
Canceling since a higher priority waiting request for 'I2::Dev::Tests-refs/pull/5203/merge' exists
|
build_wasm
The operation was canceled.
|
fmt_and_clippy
Canceling since a higher priority waiting request for 'I2::Dev::Tests-refs/pull/5203/merge' exists
|
fmt_and_clippy
Value cannot be null. (Parameter 'ContainerId')
|
fmt_and_clippy
The operation was canceled.
|
fmt_and_clippy
Value cannot be null. (Parameter 'ContainerId')
|
fmt_and_clippy
Value cannot be null. (Parameter 'ContainerId')
|