Skip to content

build(deps): [Snyk] Security upgrade ethers from 5.7.2 to 6.0.0 (#2609) #6518

build(deps): [Snyk] Security upgrade ethers from 5.7.2 to 6.0.0 (#2609)

build(deps): [Snyk] Security upgrade ethers from 5.7.2 to 6.0.0 (#2609) #6518

Triggered via push June 19, 2024 05:37
Status Failure
Total duration 35m 18s
Artifacts

dapp.yml

on: push
Fit to window
Zoom out
Zoom in

Annotations

2 errors
Dapp Tests
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
Dapp Tests
The self-hosted runner: hedera-json-rpc-relay-linux-medium-d255h-zzvqv lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.