Skip to content

Prerelease

Prerelease #2

Manually triggered November 30, 2023 15:03
Status Failure
Total duration 21m 29s
Artifacts 4

prerelease.yaml

on: workflow_dispatch
Matrix: build
Matrix: release
Fit to window
Zoom out
Zoom in

Annotations

7 errors
release (gosh-cli-linux-arm64)
Process completed with exit code 1.
release (gosh-cli-linux-amd64)
The job was canceled because "gosh-cli-linux-arm64" failed.
release (gosh-cli-linux-amd64)
The operation was canceled.
release (gosh-cli-darwin-amd64)
The job was canceled because "gosh-cli-linux-arm64" failed.
release (gosh-cli-darwin-amd64)
The operation was canceled.
release (gosh-cli-darwin-arm64)
The job was canceled because "gosh-cli-linux-arm64" failed.
release (gosh-cli-darwin-arm64)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
gosh-cli-darwin-amd64 Expired
657 MB
gosh-cli-darwin-arm64 Expired
644 MB
gosh-cli-linux-amd64 Expired
876 MB
gosh-cli-linux-arm64 Expired
870 MB