Skip to content
Re-run triggered November 22, 2023 17:37
Status Cancelled
Total duration 2m 51s
Artifacts

tests.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (38)
The job was canceled because "_39" failed.
build (38)
The operation was canceled.
build (310)
The job was canceled because "_39" failed.
build (310)
The operation was canceled.
build (39)
Process completed with exit code 1.