Skip to content

Elyra Tests

Elyra Tests #6386

Triggered via schedule September 14, 2023 10:02
Status Failure
Total duration 23m 39s
Artifacts

build.yml

on: schedule
Lint Server
19s
Lint Server
Test documentation build
12s
Test documentation build
Validate Images
13m 40s
Validate Images
Matrix: Test Server
Matrix: Validate Image Environment
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Test Server (3.9)
Process completed with exit code 2.
Test Server (3.11)
The job was canceled because "_3_9" failed.
Test Server (3.11)
Process completed with exit code 2.
Test Server (3.11)
The operation was canceled.
Test Server (3.8)
The job was canceled because "_3_9" failed.
Test Server (3.8)
The operation was canceled.
Test Server (3.8)
Process completed with exit code 2.
Test Server (3.10)
The job was canceled because "_3_9" failed.
Test Server (3.10)
The operation was canceled.