Skip to content

backport: trivial 2024 10 23 pr9 #864

backport: trivial 2024 10 23 pr9

backport: trivial 2024 10 23 pr9 #864

Triggered via pull request October 25, 2024 14:08
@PastaPastaPastaPastaPastaPasta
synchronize #6352
Status Failure
Total duration 46m 44s
Artifacts 1

build.yml

on: pull_request_target
Build Image
19s
Build Image
Matrix: Build Dependencies
Matrix: Build
Fit to window
Zoom out
Zoom in

Annotations

8 errors and 2 warnings
Build Dependencies (linux64_fuzz, x86_64-pc-linux-gnu)
Process completed with exit code 2.
Build Dependencies (linux64_nowallet, x86_64-pc-linux-gnu)
Process completed with exit code 2.
Build Dependencies (linux64_sqlite, x86_64-pc-linux-gnu)
Process completed with exit code 2.
Build Dependencies (linux64_ubsan, x86_64-pc-linux-gnu)
Process completed with exit code 2.
Build Dependencies (linux64, x86_64-pc-linux-gnu)
Process completed with exit code 2.
Build Dependencies (linux64_tsan, x86_64-pc-linux-gnu)
unable to access 'https://github.com/dashpay/dash/': Failed to connect to github.com port 443: Connection timed out
Build Dependencies (linux64_tsan, x86_64-pc-linux-gnu)
unable to access 'https://github.com/dashpay/dash/': Failed to connect to github.com port 443: Connection timed out
Build Dependencies (linux64_tsan, x86_64-pc-linux-gnu)
Process completed with exit code 2.
Build Dependencies (linux64_tsan, x86_64-pc-linux-gnu)
Failed to download action 'https://api.github.com/repos/actions/checkout/tarball/11bd71901bbe5b1630ceea73d27597364c9af683'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
Build Dependencies (linux64_tsan, x86_64-pc-linux-gnu)
Back off 27.191 seconds before retry.

Artifacts

Produced during runtime
Name Size
dashpay~dash~BTTXHR.dockerbuild
45.7 KB