Skip to content

Create go.yml

Create go.yml #1

Triggered via push August 23, 2024 15:52
Status Failure
Total duration 35s
Artifacts

go.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (1.20)
Process completed with exit code 1.
build (1.22)
The job was canceled because "_1_20" failed.
build (1.22)
The operation was canceled.
build (1.21)
The job was canceled because "_1_20" failed.
build (1.21)
The operation was canceled.
build (1.23)
The job was canceled because "_1_20" failed.
build (1.23)
The operation was canceled.