Skip to content

chore(deps): log ecosystem upgrade #10464

chore(deps): log ecosystem upgrade

chore(deps): log ecosystem upgrade #10464

Triggered via pull request August 29, 2024 09:57
Status Cancelled
Total duration 20m 51s
Artifacts

postgres.yaml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

12 errors
Build suite=test, postgres=15
Canceling since a higher priority waiting request for 'Build with Postgres/refs/pull/3112/merge' exists
Build suite=test, postgres=15
The operation was canceled.
Build suite=integration, postgres=12
Canceling since a higher priority waiting request for 'Build with Postgres/refs/pull/3112/merge' exists
Build suite=integration, postgres=12
The operation was canceled.
Build suite=test, postgres=12
Canceling since a higher priority waiting request for 'Build with Postgres/refs/pull/3112/merge' exists
Build suite=test, postgres=12
The operation was canceled.
Build suite=test, postgres=16
Canceling since a higher priority waiting request for 'Build with Postgres/refs/pull/3112/merge' exists
Build suite=test, postgres=16
The operation was canceled.
Build suite=integration, postgres=15
Canceling since a higher priority waiting request for 'Build with Postgres/refs/pull/3112/merge' exists
Build suite=integration, postgres=15
The operation was canceled.
Build suite=integration, postgres=16
Canceling since a higher priority waiting request for 'Build with Postgres/refs/pull/3112/merge' exists
Build suite=integration, postgres=16
The operation was canceled.