Skip to content

CI

CI #2978

Triggered via schedule March 7, 2024 04:06
Status Failure
Total duration 5m 35s
Artifacts 9

ci-nix.yaml

on: schedule
Matrix: Benchmarks
Matrix: Build & test
Build haddock using nix
1m 44s
Build haddock using nix
Build specification using nix
54s
Build specification using nix
Publish benchmark results
0s
Publish benchmark results
Publish test results
0s
Publish test results
Documentation
0s
Documentation
Fit to window
Zoom out
Zoom in

Annotations

3 errors
Build & test (hydra-node)
Process completed with exit code 1.
Build & test (hydra-cluster)
The job was canceled because "hydra-node" failed.
Build & test (hydra-cluster)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
benchmarks-hydra-cluster-bench-e2e Expired
750 Bytes
benchmarks-hydra-node-micro Expired
97.8 KB
benchmarks-hydra-node-tx-cost Expired
1.73 KB
benchmarks-plutus-merkle-tree-on-chain-cost Expired
438 Bytes
haddocks Expired
5.1 MB
hydra-spec Expired
658 KB
test-results-hydra-plutus Expired
970 Bytes
test-results-plutus-cbor Expired
713 Bytes
test-results-plutus-merkle-tree Expired
872 Bytes