Skip to content

Test/high availability #818

Test/high availability

Test/high availability #818

Re-run triggered October 9, 2023 13:14
Status Failure
Total duration 31m 44s
Artifacts 2
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

ci.yaml

on: pull_request
Build charms  /  ...  /  Get workflow version
4s
Build charms / Get workflow version / Get workflow version
sync-docs  /  Open PR with docs changes
2m 1s
sync-docs / Open PR with docs changes
Build charms  /  Collect charms
16s
Build charms / Collect charms
Matrix: Build charms / build
Matrix: integration-test
Matrix: integration-test-ha
Fit to window
Zoom out
Zoom in

Annotations

1 error
integration-ha
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
charms-packed-with-cache Expired
20.3 MB
juju-crashdump Expired
949 KB