Skip to content

fix update.sh to handle new guppy init.d #53

fix update.sh to handle new guppy init.d

fix update.sh to handle new guppy init.d #53

Triggered via push January 22, 2024 09:31
Status Failure
Total duration 1m 6s
Artifacts

build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (mips-linux-gnu-, zbolt)
Process completed with exit code 2.
build (mips-linux-gnu-, material)
The job was canceled because "mips-linux-gnu-_zbolt" failed.
build (mips-linux-gnu-, material)
Process completed with exit code 2.
build (aarch64-none-linux-gnu-, material)
The job was canceled because "mips-linux-gnu-_zbolt" failed.
build (aarch64-none-linux-gnu-, material)
Process completed with exit code 2.
build (aarch64-none-linux-gnu-, zbolt)
The job was canceled because "mips-linux-gnu-_zbolt" failed.
build (aarch64-none-linux-gnu-, zbolt)
Process completed with exit code 2.