Skip to content

Merge pull request #20 from pellcorp/jp_build_process_tweaks #48

Merge pull request #20 from pellcorp/jp_build_process_tweaks

Merge pull request #20 from pellcorp/jp_build_process_tweaks #48

Triggered via push January 6, 2024 18:24
Status Failure
Total duration 1m 6s
Artifacts

build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (mips-linux-gnu-, material)
Process completed with exit code 2.
build (mips-linux-gnu-, zbolt)
The job was canceled because "mips-linux-gnu-_material" failed.
build (mips-linux-gnu-, zbolt)
Process completed with exit code 2.
build (aarch64-none-linux-gnu-, zbolt)
The job was canceled because "mips-linux-gnu-_material" failed.
build (aarch64-none-linux-gnu-, zbolt)
Process completed with exit code 2.
build (aarch64-none-linux-gnu-, material)
The job was canceled because "mips-linux-gnu-_material" failed.
build (aarch64-none-linux-gnu-, material)
The operation was canceled.