Skip to content

rename 'incompatible' field to 'compatible' #3630

rename 'incompatible' field to 'compatible'

rename 'incompatible' field to 'compatible' #3630

Status Failure
Total duration 15m 49s
Artifacts 1

test-go-task.yml

on: push
run-determination
4s
run-determination
Matrix: test
tests-collector
9s
tests-collector
Matrix: test-integration
coverage-upload
0s
coverage-upload
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 1 warning
test (ubuntu-latest)
Process completed with exit code 201.
test (macos-latest)
Process completed with exit code 201.
test (windows-latest)
Process completed with exit code 1.
test-integration (ubuntu-latest, upgrade)
Failed to restore: The operation cannot be completed in timeout.

Artifacts

Produced during runtime
Name Size
coverage-data Expired
59.8 MB