Skip to content

[WIP]

[WIP] #8

Triggered via push November 30, 2024 19:02
Status Failure
Total duration 1m 23s
Artifacts

spring-boot.yml

on: push
Matrix: build-java
Fit to window
Zoom out
Zoom in

Annotations

19 errors
Java 21-temurin w/ PostgreSQL 15.10
Process completed with exit code 1.
Java 21-temurin w/ PostgreSQL 17.2
The job was canceled because "_21_temurin_15_10" failed.
Java 17-zulu w/ PostgreSQL 16.6
The job was canceled because "_21_temurin_15_10" failed.
Java 17-zulu w/ PostgreSQL 13.18
The job was canceled because "_21_temurin_15_10" failed.
Java 17-temurin w/ PostgreSQL 13.18
The job was canceled because "_21_temurin_15_10" failed.
Java 21-zulu w/ PostgreSQL 17.2
The job was canceled because "_21_temurin_15_10" failed.
Java 21-zulu w/ PostgreSQL 17.2
The operation was canceled.
Java 21-zulu w/ PostgreSQL 16.6
The job was canceled because "_21_temurin_15_10" failed.
Java 21-zulu w/ PostgreSQL 16.6
The operation was canceled.
Java 21-zulu w/ PostgreSQL 14.15
The job was canceled because "_21_temurin_15_10" failed.
Java 21-zulu w/ PostgreSQL 14.15
The operation was canceled.
Java 17-zulu w/ PostgreSQL 17.2
The job was canceled because "_21_temurin_15_10" failed.
Java 17-zulu w/ PostgreSQL 17.2
The operation was canceled.
Java 21-temurin w/ PostgreSQL 13.18
The job was canceled because "_21_temurin_15_10" failed.
Java 21-temurin w/ PostgreSQL 13.18
The operation was canceled.
Java 21-zulu w/ PostgreSQL 13.18
The job was canceled because "_21_temurin_15_10" failed.
Java 21-zulu w/ PostgreSQL 13.18
The operation was canceled.
Java 21-zulu w/ PostgreSQL 15.10
The job was canceled because "_21_temurin_15_10" failed.
Java 21-zulu w/ PostgreSQL 15.10
The operation was canceled.