5 changes: 3 additions & 2 deletions ORBIT/core/defaults/common_costs.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -10,6 +10,7 @@ port_cost_per_month: 2e6 # USD/month
export_system_design:
cable_crossings:
crossing_unit_cost: 500000

# Spar component cost rates
spar_design:
stiffened_column_CR: 3120 # USD/t
Expand All @@ -28,7 +29,7 @@ substation_design:
HVDC-bipole: 476e6
shunt_cost_rate: 35000 # USD/MW
mpt_unit_cost: 2.87e6 # USD/mpt
shunt_unit_cost: 1e4 # USD/cable
shunt_unit_cost: 10000 # USD/cable
switchgear_cost: 4e6 # USD/cable
dc_breaker_cost: 10.5e6 # USD/cable
backup_gen_cost: 1e6 # USD
Expand All @@ -44,7 +45,7 @@ substation_design:

# Onshore substation component cost rates
onshore_substation_design:
shunt_unit_cost: 1.3e4 # USD/cable
shunt_unit_cost: 13000 # USD/cable
switchgear_cost: 9.33e6 # USD/cable
compensation_rate: 31.3e6 # USD/cable
onshore_converter_cost: # USD
Expand Down