Skip to content

chore: move to a flow-based model #2

chore: move to a flow-based model

chore: move to a flow-based model #2

Triggered via push October 10, 2023 19:23
Status Cancelled
Total duration 32s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

release.yml

on: push
Algorand build  /  smart-contract-ci
20s
Algorand build / smart-contract-ci
CI API  /  node-ci
7s
CI API / node-ci
CI Dapp  /  node-ci
17s
CI Dapp / node-ci
CI Infrastructure  /  node-ci
16s
CI Infrastructure / node-ci
CI xGov Dapp  /  node-ci
16s
CI xGov Dapp / node-ci
Deploy to Prod
0s
Deploy to Prod
Build API  /  build-zip
Build API / build-zip
Build Dapp  /  build-zip
Build Dapp / build-zip
Build Infrastructure  /  build-zip
Build Infrastructure / build-zip
Build xGov Dapp  /  build-zip
Build xGov Dapp / build-zip
Deploy to TestNet
0s
Deploy to TestNet
Fit to window
Zoom out
Zoom in

Annotations

10 errors
CI xGov Dapp / node-ci
The run was canceled by @PhearZero.
CI xGov Dapp / node-ci
The operation was canceled.
CI API / node-ci
The run was canceled by @PhearZero.
CI API / node-ci
The operation was canceled.
CI Infrastructure / node-ci
The run was canceled by @PhearZero.
CI Infrastructure / node-ci
The operation was canceled.
CI Dapp / node-ci
The run was canceled by @PhearZero.
CI Dapp / node-ci
The operation was canceled.
Algorand build / smart-contract-ci
The run was canceled by @PhearZero.
Algorand build / smart-contract-ci
The operation was canceled.