Skip to content

Bump go.opentelemetry.io/contrib/instrumentation/google.golang.org/grpc/otelgrpc from 0.39.0 to 0.45.0 #629

Bump go.opentelemetry.io/contrib/instrumentation/google.golang.org/grpc/otelgrpc from 0.39.0 to 0.45.0

Bump go.opentelemetry.io/contrib/instrumentation/google.golang.org/grpc/otelgrpc from 0.39.0 to 0.45.0 #629

Status Failure
Total duration 2m 22s
Artifacts

build-and-test.yml

on: pull_request
setup-environment
25s
setup-environment
Matrix: cross-build-collector
Matrix: unittest
Fit to window
Zoom out
Zoom in

Annotations

15 errors
checks
Process completed with exit code 2.
cross-build-collector (darwin, arm64)
Process completed with exit code 2.
cross-build-collector (darwin, amd64)
Process completed with exit code 2.
cross-build-collector (linux, arm)
Process completed with exit code 2.
unittest (1.19)
Process completed with exit code 2.
cross-build-collector (linux, 386)
Process completed with exit code 2.
unittest (1.20)
The job was canceled because "_1_19" failed.
unittest (1.20)
Process completed with exit code 2.
cross-build-collector (linux, amd64)
Process completed with exit code 2.
cross-build-collector (linux, arm64)
Process completed with exit code 2.
test-coverage
Process completed with exit code 2.
lint
Process completed with exit code 2.
cross-build-collector (windows, amd64)
Process completed with exit code 2.
cross-build-collector (linux, ppc64le)
Process completed with exit code 2.
cross-build-collector (windows, 386)
Process completed with exit code 2.