Skip to content

RADICAL-Pilot Integration with Parsl #2115

RADICAL-Pilot Integration with Parsl

RADICAL-Pilot Integration with Parsl #2115

Triggered via pull request October 26, 2023 21:11
Status Failure
Total duration 1h 5m 8s
Artifacts

ci.yaml

on: pull_request
Matrix: main-test-suite
Fit to window
Zoom out
Zoom in

Annotations

8 errors and 8 warnings
main-test-suite (3.10)
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 60 minutes.
main-test-suite (3.10)
The operation was canceled.
main-test-suite (3.11)
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 60 minutes.
main-test-suite (3.11)
The operation was canceled.
main-test-suite (3.9)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 60 minutes.
main-test-suite (3.9)
The operation was canceled.
main-test-suite (3.8)
The job running on runner GitHub Actions 4 has exceeded the maximum execution time of 60 minutes.
main-test-suite (3.8)
The operation was canceled.
main-test-suite (3.10)
Runner GitHub Actions 2 did not respond to a cancelation request with 00:05:00.
main-test-suite (3.10)
There are over 10,000 files in this artifact, consider creating an archive before upload to improve the upload performance.
main-test-suite (3.11)
Runner GitHub Actions 3 did not respond to a cancelation request with 00:05:00.
main-test-suite (3.11)
There are over 10,000 files in this artifact, consider creating an archive before upload to improve the upload performance.
main-test-suite (3.9)
Runner GitHub Actions 5 did not respond to a cancelation request with 00:05:00.
main-test-suite (3.9)
There are over 10,000 files in this artifact, consider creating an archive before upload to improve the upload performance.
main-test-suite (3.8)
Runner GitHub Actions 4 did not respond to a cancelation request with 00:05:00.
main-test-suite (3.8)
There are over 10,000 files in this artifact, consider creating an archive before upload to improve the upload performance.