refactor: Replace pendulum
with stdlib datetime parsing
#276
ci.yml
on: pull_request
Matrix: Test Tap connectivity and Configuration
Annotations
10 errors
Test Tap connectivity and Configuration (3.11, deps)
Process completed with exit code 1.
|
Test Tap connectivity and Configuration (3.10, py310)
The job was canceled because "_3_11_deps" failed.
|
Test Tap connectivity and Configuration (3.8, py38)
The job was canceled because "_3_11_deps" failed.
|
Test Tap connectivity and Configuration (3.8, py38)
The operation was canceled.
|
Test Tap connectivity and Configuration (3.9, py39)
The job was canceled because "_3_11_deps" failed.
|
Test Tap connectivity and Configuration (3.9, py39)
The operation was canceled.
|
Test Tap connectivity and Configuration (3.11, py311)
The job was canceled because "_3_11_deps" failed.
|
Test Tap connectivity and Configuration (3.11, py311)
The operation was canceled.
|
Test Tap connectivity and Configuration (3.12, py312)
The job was canceled because "_3_11_deps" failed.
|
Test Tap connectivity and Configuration (3.12, py312)
The operation was canceled.
|