Skip to content

Corrected spelling and grammar mistakes #4567

Corrected spelling and grammar mistakes

Corrected spelling and grammar mistakes #4567

Re-run triggered December 18, 2024 12:39
Status Failure
Total duration 11m 36s
Artifacts 5

test.yml

on: pull_request
Build test binaries
4m 10s
Build test binaries
Build test artifacts (postgres)
3m 32s
Build test artifacts (postgres)
Build test artifacts (sqlite)
3m 34s
Build test artifacts (sqlite)
Matrix: test-integration
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 4 warnings
test-integration (99)
Process completed with exit code 100.
test-integration (2)
The job was canceled because "_99" failed.
test-integration (2)
The operation was canceled.
demo-native
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
test-integration (99)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
test-postgres
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
test-sqlite
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636

Artifacts

Produced during runtime
Name Size
nextest-archive-postgres Expired
101 MB
nextest-archive-sqlite Expired
91.6 MB
process-compose-logs-integration-v2 Expired
793 Bytes
process-compose-logs-integration-v99 Expired
800 Bytes
test-binaries Expired
158 MB