Skip to content

fix(sentry): supprime la configuration incorrecte de nettoyage de sou… #1234

fix(sentry): supprime la configuration incorrecte de nettoyage de sou…

fix(sentry): supprime la configuration incorrecte de nettoyage de sou… #1234

Re-run triggered November 21, 2024 15:22
Status Failure
Total duration 26s
Artifacts

docker.yml

on: push
Matrix: build-and-push
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build-and-push (front-stylo)
Process completed with exit code 125.
build-and-push (export-stylo)
The job was canceled because "front-stylo" failed.
build-and-push (export-stylo)
The operation was canceled.
build-and-push (graphql-stylo)
The job was canceled because "front-stylo" failed.
build-and-push (graphql-stylo)
Process completed with exit code 125.