v2: merge main into v2 again #3263
appsec.yml
on: pull_request
Prepare Go modules cache
6s
Smoke Tests
/
Test matrix
Matrix: disabled
Matrix: golang-linux-container
Matrix: macos
Matrix: Smoke Tests / Build go-dvwa
Waiting for pending jobs
Annotations
7 errors and 1 warning
macos-14 go1.23
Process completed with exit code 1.
|
macos-12 go1.23
The job was canceled because "macos-14_1_23" failed.
|
macos-12 go1.23
The operation was canceled.
|
macos-14 go1.22
The job was canceled because "macos-14_1_23" failed.
|
macos-14 go1.22
The operation was canceled.
|
macos-12 go1.22
The job was canceled because "macos-14_1_23" failed.
|
macos-12 go1.22
The operation was canceled.
|
AppSec Tests
This workflow ran on a hosted runner that uses the "Base Image for Ubuntu Server 22.04". This image will be deprecated in September 2024. Please setup a new runner to use the "Ubuntu 22.04 by Arm Limited" or "Ubuntu 24.04 by Arm Limited" image. This will help reduce workflow run times as there are pre-installed tools. To view the list of installed software on new images, check out https://github.com/actions/partner-runner-images repository.
|