Add "testing before case installation" sections
  • Loading branch information
bstiq authored Jan 19, 2024
2 parents 837776f + ee08c82 commit 948157a
Show file tree
Hide file tree
Showing 11 changed files with 54 additions and 4 deletions.
4 changes: 4 additions & 0 deletions .wordlist.txt
Original file line number Diff line number Diff line change
Expand Up @@ -81,3 +81,7 @@ overtighten
Kapton
Din
Dout
Keycaps
Pseudoku
Asymplex
daughterboard
2 changes: 2 additions & 0 deletions Gemfile
Original file line number Diff line number Diff line change
Expand Up @@ -9,3 +9,5 @@ gem "just-the-docs", "0.7.0" # pinned to the current release
gem "jekyll-remote-theme"

gem "jekyll-default-layout"

gem "json" # work around upstream bug (?)
1 change: 1 addition & 0 deletions _config.yml
Original file line number Diff line number Diff line change
Expand Up @@ -15,6 +15,7 @@ exclude:
- Gemfile.lock
- _site/
- building-locally.md
- cspell.config.yaml

plugins:
- jekyll-default-layout
Expand Down
6 changes: 3 additions & 3 deletions _includes/splinktegrated_preparation.md
Original file line number Diff line number Diff line change
Expand Up @@ -65,7 +65,7 @@ In this section, we will solder headers to the PCB. **They will be close to some
![](../assets/pics/guides/splinktegrated/7.jpg)

- Inspect the front of the assembly: 
- Make sure that the headers are flush with the motherboard and daugtherboard
- Make sure that the headers are flush with the motherboard and daughterboard
- Solder the top headers, then the bottom headers
- Finally, cut the headers to make them flush using pliers

Expand Down Expand Up @@ -151,7 +151,7 @@ In the next section, we will prepare the first Splinktegrated by installing the
![](../assets/pics/guides/splinktegrated/8.jpg)

- Inspect the front of the assembly: 
- Make sure that the headers are flush with the motherboard and daugtherboard
- Make sure that the headers are flush with the motherboard and daughterboard
- Solder the top headers, then the bottom headers
- Finally, cut the headers to make them flush using pliers

Expand Down Expand Up @@ -213,4 +213,4 @@ You now have 2 Splinktegrated assemblies. Make sure they match with the pictures

![](../assets/pics/guides/splinktegrated/23.jpg)

![](../assets/pics/guides/splinktegrated/24.jpg)
![](../assets/pics/guides/splinktegrated/24.jpg)
37 changes: 37 additions & 0 deletions _includes/testing_pcb.md
Original file line number Diff line number Diff line change
@@ -0,0 +1,37 @@
# Testing the PCBs

Now is a great time to function test the assembled PCBs, as any troubleshooting steps you might need to complete will be much easier to do while the plates are still outside of the case.

{: .note }
The TRRS connection will not work yet, as only ony one leg of the jack is connected. You can test this part later.

**For the following step, please prepare** a pair of tweezers that are conductive. If you don't have any, you can also use a piece of wire, or a single switch.

## Testing the LEDs

If you have installed per-key LEDs, let's start with testing those.
If you don't have any per-key RGB installed, you can skip to the next section.

- connect one half to your PC via USB, and observe the LEDs:
- do they all light up?
- are the colors correct?
- can you see a rainbow animation play?

Does everything look fine? Great, go ahead with testing the switches.

If not, reflowing the pads of the LEDs not working should do the trick. Please see [Troubleshooting]({{site.baseurl}}/help/troubleshooting.html#one-or-more-leds-dont-work) for details.

## Testing the switches

To test the switches, we are going to use the VIA interface. All Bastard Keyboards come pre-flashed with VIA, so you don't have to flash anything.

Open [VIA](https://usevia.app/) - please note this only works on chromium-based browsers like chromium, edge, chrome.

![](../assets/pics/guides/generic/7.jpg)

After connecting to your device, switch to the key tester page using the stethoscope pictogram, then activate the "Test Matrix" option. Now, you can connect each pair of switch pads in turn, using your tweezers, a wire, or a switch inclined enough.


![](../assets/pics/guides/generic/8.jpg)

Did all the keys light up in VIA? Great, proceed to case installation! Not quite perfect yet? Don't worry, proceed to the [Troubleshooting]({{site.baseurl}}/help/troubleshooting.html) section!
Binary file added assets/pics/guides/generic/7.jpg
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
Binary file added assets/pics/guides/generic/8.jpg
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
2 changes: 2 additions & 0 deletions bg_charybdis/10install_the_switches.md
Original file line number Diff line number Diff line change
Expand Up @@ -10,6 +10,8 @@ parent: Build guide - Charybdis
1. TOC
{:toc}

{% include testing_pcb.md %}

# Introduction

Now that everything is connected together, the next step is to install the switches and the PCBs into the case. The process is exactly the same for both sides, so we will detail only the Scylla side (without trackball).
Expand Down
1 change: 1 addition & 0 deletions bg_cnano/10install_the_switches.md
Original file line number Diff line number Diff line change
Expand Up @@ -10,6 +10,7 @@ parent: Build guide - Charybdis Nano
1. TOC
{:toc}

{% include testing_pcb.md %}

# Introduction

Expand Down
4 changes: 3 additions & 1 deletion bg_scylla/10install_the_switches.md
Original file line number Diff line number Diff line change
Expand Up @@ -10,6 +10,8 @@ parent: Build guide - Scylla
1. TOC
{:toc}

{% include testing_pcb.md %}

# Introduction

Now that everything is connected together, the next step is to install the switches and the PCBs into the case. The process is exactly the same for both sides, so we will detail only the Scylla side (without trackball).
Expand Down Expand Up @@ -38,4 +40,4 @@ When installing the switches, use the following technique:
- start with the top two switches (labeled 1, in red on the picture)
- continue with the outer four switches (labeled 2, in blue on the picture)
- continue with the bottom six switches (labeled 3, in green on the picture)
- finally, install the rest of the switches
- finally, install the rest of the switches
1 change: 1 addition & 0 deletions bg_skeletyl/10install_the_switches.md
Original file line number Diff line number Diff line change
Expand Up @@ -10,6 +10,7 @@ parent: Build guide - Skeletyl
1. TOC
{:toc}

{% include testing_pcb.md %}

# Introduction

Expand Down

0 comments on commit 948157a

Please sign in to comment.