Skip to content

Build main ๐Ÿš€ #297

Build main ๐Ÿš€

Build main ๐Ÿš€ #297

Triggered via push August 20, 2024 03:19
Status Failure
Total duration 5m 21s
Artifacts 2
Matrix: โš™ Run PR Workflow / BuildInstaller
โš™ Run PR Workflow  /  ๐Ÿ”Ž IPT Format check
1m 17s
โš™ Run PR Workflow / ๐Ÿ”Ž IPT Format check
โš™ Run PR Workflow  /  ๐Ÿ‘ท Documentation
4m 37s
โš™ Run PR Workflow / ๐Ÿ‘ท Documentation
โš™ Run PR Workflow  /  ...  /  Test
โš™ Run PR Workflow / ๐Ÿ‘ฉ๐Ÿพโ€๐Ÿ”ฌ Compilation: Each commit / Test
โš™ Run PR Workflow  /  ๐Ÿ”Ž Linting
17s
โš™ Run PR Workflow / ๐Ÿ”Ž Linting
Matrix: โš™ Run PR Workflow / CompilationTest
Waiting for pending jobs
Matrix: โš™ Run PR Workflow / TestWithoutHardware
Waiting for pending jobs
Matrix: โš™ Run PR Workflow / TestITC1600
Waiting for pending jobs
Matrix: โš™ Run PR Workflow / TestITC18
Waiting for pending jobs
Matrix: โš™ Run PR Workflow / TestNI
Waiting for pending jobs
โš™ Run PR Workflow  /  ๐Ÿ“ฆ FTP Upload Artifacts
0s
โš™ Run PR Workflow / ๐Ÿ“ฆ FTP Upload Artifacts
โš™ Run PR Workflow  /  ๐Ÿ‘ฎ๐Ÿผ Validate NWBv2
0s
โš™ Run PR Workflow / ๐Ÿ‘ฎ๐Ÿผ Validate NWBv2
๐Ÿ“Š Generate Reports
0s
๐Ÿ“Š Generate Reports
โœˆ๏ธ Deploy documentation
0s
โœˆ๏ธ Deploy documentation
โœˆ๏ธ Deploy Installer
0s
โœˆ๏ธ Deploy Installer
๐Ÿ“ฆ FTP Upload Artifacts
31s
๐Ÿ“ฆ FTP Upload Artifacts
Fit to window
Zoom out
Zoom in

Annotations

2 errors
โš™ Run PR Workflow / ๐Ÿ— Build dev installer
Process completed with exit code 1.
โš™ Run PR Workflow / ๐Ÿ— Build user installer
The job was canceled because "dev" failed.

Artifacts

Produced during runtime
Name Size
BuildInstaller-dev-assets Expired
26.3 MB
Documentation-assets Expired
5.73 MB